
Saturday, January 29, 2011
Ivan back to school

Thursday, January 13, 2011
It's gonna be a cold CNY
Department spokesman Ramlan Abdul Rahman said Malaysia was still not out of the Northeast monsoon season, which started in November and lasted till March, that brought heavy rainfall to the east side of Peninsular Malaysia such as Kelantan, Terengganu and Pahang as well as Sabah and Sarawak.
“As this monsoon wind is particularly strong, it often brings heavy rain to the west side of Peninsular Malaysia as well during this period,” he said.
The department has also registered greater cloud activity during the period and forecasts the erratic cloud patterns to last longer. It said the erratic cloud pattern and rain were the two major contributing factors for the cool weather.
Personally, for those who are of asthmatic background have to take note of these current weather. Don't let the cold air become a trigger for a bad allergic symptoms.
2011
But....no harm trying

Wednesday, September 8, 2010
AirAsia: Travel 2 in the price of 1
Tuesday, September 7, 2010
The war of the TABLET!
Yup, the war is on guys! Some people is going the give Steve Jobs a chase for the BIG PIE
Berlin, Germany, September 2nd, 2010 - Samsung Electronics Co., Ltd, a global leader in mobile technology, today announced the launch of the Samsung GALAXY Tab (Model: GT-P1000). Powered by Android Operating System 2.2, the Samsung GALAXY Tab is the first of the company’s tablet devices, representing a new category of mobile products for Samsung.
The Samsung GALAXY Tab brings together all of Samsung's leading innovations to provide users with more capabilities while on the move. Consumers are able to experience PC-like web-browsing and enjoy all forms of multimedia content on the perfectly sized 7-inch display, wherever they go. Moreover, users can continuously communicate via e-mail, voice and video call, SMS/MMS or social network with the optimized user interface.
Samsung GALAXY Tab (GT-P1000) Product Specifications
Network | 2.5G (GSM/ GPRS/ EDGE) : 850 / 900 / 1800 / 1900 MHz |
OS | Android 2.2 (Froyo) |
Display | 7.0 inch TFT-LCD, WSVGA (1024 x 600) |
Processor | Cortex A8 1.0GHz Application Processor with PowerVR SGX540 |
Camera | 3 MP Camera with Auto Focus and LED Flash |
Value-added | Android Market™ and Samsung Apps for more applications and contents |
Readers Hub, Media Hub* , Music Hub*, Social Hub* | |
Adobe Flash 10.1 player support | |
Connectivity | 30 pin connector / micro SD |
Memory | 16GB / 32GB internal memory, upto 32GB external memory slot |
Size | 190.09 x 120.45 x 11.98mm, 380g |
Battery | 4,000mAh (7 hour movie play) |
Semenyih water plant closed due to contamination
In a statement, Syabas said raw water from Sungai Kembong in Selangor was contaminated due to "leachate" leaking from a breached dyke in the landfill.
"The plant was closed immediately upon detecting high content of ammonia in the water at 6.41mg per litre, which is above the health safety standard of 1.5mg per litre, put into place by the Health Ministry.
"A yellow alert emergency plan has been into place. We are now trying to redistribute water from other treatment plants to the affected areas," it said.
The closure of the plant, which treated some 600mil litres of water daily, is expected to affect supply to 1.2mil residents or 300,000 households in four areas - Petaling, Hulu Langat, Sepang and Kuala Langat.
Leachate = usually refers to the liquid that drains out the bottom of landfills, garbage dumps, or other waste disposal sites. Leachate forms as water percolates through solid waste.
Abstracted from TheStarOnline
Thursday, September 2, 2010
Surgeons must get consent to take photos of intimate parts
Judicial Commissioner Chew Soo Ho awarded freelance writer Lee Ewe Poh, 50, RM25,000 in damages for invasion of privacy and RM10,000 in costs. Lee, a former journalist, had filed the suit against general and colo-rectal surgeon Dr Lim Teik Mau saying she felt violated after he took photographs of her private parts during a haemorrhoids surgery.
Abstracted from TheStarOnline
Old Kajang Stadium for New Kajang Square
The 40-year-old Kajang Stadium will make way for the new Kajang Square project with cost estimated at RM5.5 Mil. The stadium, built in the late 1970s, will be turned into a public square where people could jog or enjoy a stroll. The project would include a multi-million rinngit sports complex with futsal and badminton courts, field for tai chi, yoga and aerobic activities, a children’s playground and kiosks selling various wares.
The first phase, a playground will be built at a cost of RM200,000 which is almost completed. The second phase will include the building of two futsal courts. Part of the walls will be torn down but the field will remain. There will be a bitumen track instead of synthetic rubber, which will incur more cost. The Kajang Square will also have kiosks and a stage. The whole project would take about three years to complete.


